Skip to content

For Mechanics

You keep the fleet flying. WingWrangler gives you the squawk queue, the work orders, and the inspection countdowns — without a clipboard in sight.

This page covers the five things an A&P actually does here.

Pilots write up what they find; the squawks land in Maintenance → Squawks. Each one has a severity set by the reporter, which drives what happens next:

SeverityWhat HappensExample
CriticalAircraft grounds automatically. Nobody books it until you clear it.Oil pressure fluctuation in flight
MajorFlagged priority — needs a look before the next flight.Rough engine at 2,300 RPM
MinorLogged for the next maintenance cycle.Sticky cabin door latch

You review each squawk and decide: quick fix (resolve it on the spot and close the squawk) or work order (parts, labor, and a paper trail).

Every maintenance task follows the same path in Maintenance → Work Orders:

StatusMeaning
OpenFiled, waiting on a wrench.
In ProgressYou’re on it.
CompletedSigned off. Aircraft back on the schedule.
CancelledDuplicate, or couldn’t reproduce.

Work orders can be assigned to you directly (you get notified) or left in the general queue for whoever claims them first. Log every part you pull and your labor hours as you go — that’s what builds the per-aircraft cost record and the reliability reports your boss reads.

Maintenance → Scheduled Items tracks every recurring requirement per aircraft:

  • Calendar items — the annual, 12 calendar months, no exceptions.
  • Hour items — 100-hour inspections for training aircraft.
  • Both — oil changes every 50 hours or 4 months, whichever comes first.

WingWrangler computes the due dates from the aircraft’s Hobbs and tach readings, which update themselves every time someone logs a flight. You’ll see what’s coming on your dashboard before anything goes overdue — and so will the admins.

Airworthiness Directives go in Maintenance → Scheduled Items alongside everything else. Enter the AD number, record when you complied, and flag whether it’s recurring. Recurring ADs get an interval — hours or calendar — and the system watches them like any other item.

Before you pull a cowling, put a maintenance block on the schedule (Schedule → Maintenance Block). The aircraft shows as unavailable for that window — nobody books N7892K for a 2 PM lesson while its 100-hour is at noon. If work runs long, extend the block; dispatch and students see the change immediately.

1. Accept your invite

Email link from your school or club → set a password.

2. Check the queue

Maintenance → Squawks. Anything critical has already grounded its aircraft.

3. Review what's due

Maintenance → Scheduled Items. See what’s coming due across the fleet this month.

4. Look at open work orders

Maintenance → Work Orders. Claim or get assigned, then work them.

  • Maintenance — the full guide: priorities, parts and costs, ADs, reports
  • Fleet Management — aircraft records, status changes, document expirations
  • Scheduling — how maintenance blocks interact with bookings